A warehouse construction project is a major undertaking which can be both complex and time-consuming. The planning stage is crucial to achieving a functional, safe and fit-for-purpose outcome.
The combination of design, layout, infrastructure, systems, process and people are key to warehouse efficiency; with the design element playing a focal role in accommodating business requirements and maximising the utility of space.
The opportunity for cost savings can be identified primarily within the preliminary stages of design, where an experienced design and construct team can both optimise an existing building design, or create a tailor made solution matching the exact requirements of the project.
Furthermore, precast panels combined with structural steel as a construction system allows for time and cost efficiencies, in addition to having the ability to minimise people and equipment on-site, not to mention delivery and erection can be better streamlined.
Fortunately through Akura’s structural steel and precast concrete manufacturing plant, we have the ability to streamline the construction process; producing cost and time savings for our clients.
For more information on Akura’s manufacturing capabilities, or our ability to customise a design and construct building solution for you, please contact our friendly team.